question

Brian Davis avatar image
Brian Davis asked

What are insight credits?

Looking on my billing summary page, I see there are 167 credits for "Performance Level 1". What are these credits? Are they usable by me in some fashion? If so, how?

1 comment
10 |1200

Up to 2 attachments (including images) can be used with a maximum of 512.0 KiB each and 1.0 MiB total.

Brian Davis avatar image Brian Davis commented ·

After further research, I have found the Insights Pricing page. The example where a studio "started with no data and added 1 TB of data per day each day for 30 days" somehow averages 15TB of data for the month is confusing, but other than that....

0 Likes 0 ·

1 Answer

·
brendan avatar image
brendan answered

The Performance Level you set in the Insights Management tab determines the number of credits per hour you're consuming and paying for. Increasing your Performance Level increases the amount of cache space you have for your event data, for queries in Insights, as well as the compute power available for those queries, the max concurrent queries, etc. You can read more about this here:

https://docs.microsoft.com/en-us/gaming/playfab/features/insights/insights/performance-retention

https://docs.microsoft.com/en-us/gaming/playfab/features/insights/insights/best-practices

10 |1200

Up to 2 attachments (including images) can be used with a maximum of 512.0 KiB each and 1.0 MiB total.

Write an Answer

Hint: Notify or tag a user in this post by typing @username.

Up to 2 attachments (including images) can be used with a maximum of 512.0 KiB each and 1.0 MiB total.